Every solar, wind and battery application in the county's planning register,
joined to the ESB Networks substation nearest it and the generation capacity that substation
has available. Updated from public records; last checked Sep 1, 2026.
Enter an Eircode, or a town, village or townland name. Only the routing
key — the first three characters — is used and it is never stored: that places you within
a few kilometres of your town, which is all this needs, and Eircode's full address
database is licensed and not public anyway. All 139 routing keys in the
country are covered.
27
Utility-scale projects
solar, wind and battery
16
Still live in the system
not refused, withdrawn or lapsed
1.2
MW stated
from 1 of 27 applications that state one
294.5
Hectares of site area
across 26 applications
23
Substations with no capacity
of 46 near these projects
0
Under appeal now
3 have been appealed at some point
Where they are
The map plots 27 projects on a background supplied by
OpenStreetMap, which receives your IP address when it loads.
Positions are as published in the national planning register, or — for
applications made directly to An Coimisiun Pleanala — at the centre of the site boundary that
case publishes. Colour shows planning status.
Planning status
Technologies
A project appears under each technology it includes, so co-located
solar-and-battery schemes are counted in both.
Grid capacity
8 of 27 projects
are matched to a named substation with enough confidence to publish the link
(29.6%). The remaining 19 are
listed as unmatched rather than guessed — matching a project to the wrong substation is worse
than leaving it unmatched, so a name match must also be corroborated by distance before it counts.
14 projects sit at a substation ESB Networks
currently publishes as having no firm generation capacity available.
We track every solar, wind and battery application in the national planning register — and the
large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as
they move through planning, and which substations still have capacity to take a connection. If you
want to be told when something is lodged near your land, leave an email address.