Located on land at Cummeennabuddoge (County Kerry), Clydaghroe (County Kerry), Glashacormick (County Kerry), Cummeenavrick (County Kerry), and Caherdowney (County Cork). (www.cummeennabuddogeplanning.ie)
A wind farm is already operating here
This is a record about the location, not about this application. Several applications can sit at one wind farm — extensions, repowers and amendments among them — and this one may be unrelated to it. Matched by name and position from SEAI's Wind Farms in Ireland (June 2022 snapshot, CC-BY 4.0), so it records what had connected by that date rather than what is generating now.
This project holds a grid connection offer
EirGrid's connection batches record an offer for this application with a maximum export capacity of 122.4 MW, connecting at the Ballyvouskill node. EirGrid lists it as Cummeennabuddoge Wind Farm, applicant Cummeennabuddoge Wind Designated Activity Company. The offer quarter is Q3 2026.
Source: ECP-GSS-1 Final Batch, May 2026. Matched to this application by the planning reference EirGrid publishes, confirmed against the county. An offer is a place in the connection process, not a connection: it does not mean the project is built or generating.
Grid
Association: No confident match to a named grid station.
Available capacity: No firm generation capacity currently available at GARROW.
A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.
Planning timeline
| Application lodged | Oct 10, 2024 |
|---|
Source
Planning data: An Coimisiún Pleanála case register (ArcGIS Cases_2016_Onwards). This application was made directly to the Commission and is not on Kerry County Council's planning register. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Case file: An Coimisiún Pleanála case record.
Own land near one of these?
We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.
Email us to be added to the list — we will only use it to send project alerts for the areas you name.
No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.