Renewable energy projects near Killerig

Solar, wind and battery applications in the planning register for Killerig and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

2
Projects here
2
Still live
not refused, withdrawn or lapsed
Not stated
Capacity
no application here states a figure in MW
Hectares of site area
across 0 applications

The map plots 2 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Killerig Permission granted 2

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Battery storage + Solar — Killerig

Permission granted Capacity not statedLodged Feb 12, 2019 Ref 1946
Grid: CARLOW (110 kV), 2.23 km away. No firm generation capacity currently available at CARLOW.

Battery storage + Solar — Killerig

Permission granted Capacity not statedLodged May 30, 2023 Ref 2392
Grid: CARLOW (110 kV), 3.54 km away. No firm generation capacity currently available at CARLOW.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Carlow