Renewable energy projects near Bandon

Solar, wind and battery applications in the planning register for Bandon and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

5
Projects here
4
Still live
not refused, withdrawn or lapsed
Not stated
Capacity
no application here states a figure in MW
5.9
Hectares of site area
across 2 applications

The map plots 5 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Bandon Application submitted 2 Permission granted 2 No decision recorded 1

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Battery storage — Bandon

Application submitted Capacity not stated4.61 ha siteLodged Dec 17, 2025 Ref 25/6845
Grid: BANDON (110 kV), 1.34 km away. 11.5 MW of firm generation capacity available at BANDON.

Battery storage + Wind — Bandon

Application submitted Capacity not stated1.29 ha siteLodged Dec 19, 2025 Ref 25/6877
Grid: BANDON (110 kV), 0.51 km away. 11.5 MW of firm generation capacity available at BANDON.

Solar — Bandon

Permission granted Capacity not statedLodged May 30, 2022 Ref 22/5234
Grid: BANDON (110 kV), 0.74 km away. 11.5 MW of firm generation capacity available at BANDON.

Solar — Bandon

Permission granted Capacity not statedLodged Dec 12, 2023 Ref 23/6470
Grid: BRINNY (38 kV), 0.75 km away. ESB Networks has not published available generation capacity for BRINNY.

Solar — Bandon

No decision recorded Capacity not statedLodged Apr 20, 2022 Ref 22/4890
Grid: BANDON (110 kV), 0.72 km away. 11.5 MW of firm generation capacity available at BANDON.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Cork