Renewable energy projects near Garranure

Solar, wind and battery applications in the planning register for Garranure and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

7
Projects here
4
Still live
not refused, withdrawn or lapsed
18.0
MW stated
from 4 applications that state one
11.3
Hectares of site area
across 1 application

The map plots 7 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Garranure Permission granted 4 Permission refused 1 No decision recorded 2

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Garranure

Permission granted Capacity not stated11.34 ha siteLodged Aug 28, 2024 Ref 24/474
Grid: BALLINEEN (38 kV), 0.84 km away. ESB Networks has not published available generation capacity for BALLINEEN.

Wind — Garranure

Permission granted Capacity not statedLodged Feb 28, 2001 Ref 01/980
Grid: BALLINEEN (38 kV), 3.06 km away. ESB Networks has not published available generation capacity for BALLINEEN.

Solar — Garranure

Permission granted 4.0 MW statedLodged Sep 21, 2017 Ref 17/6441
Grid: ENNISKEANE (38 kV), 0.55 km away. No firm generation capacity currently available at ENNISKEANE.

Solar — Garranure

Permission granted 5.0 MW statedLodged Nov 20, 2017 Ref 17/724
Grid: BALLINEEN (38 kV), 0.83 km away. ESB Networks has not published available generation capacity for BALLINEEN.

Wind — Garranure

Permission refused Capacity not statedLodged Nov 7, 2011 Ref 11/676
Grid: BALLINEEN (38 kV), 3.06 km away. 8.5 MW of firm generation capacity available at DUNMANWAY.

Solar — Garranure

No decision recorded 4.0 MW statedLodged Aug 21, 2017 Ref 17/6172
Grid: ENNISKEANE (38 kV), 0.6 km away. No firm generation capacity currently available at ENNISKEANE.

Solar — Garranure

No decision recorded 5.0 MW statedLodged Nov 13, 2017 Ref 17/713
Grid: BALLINEEN (38 kV), 0.83 km away. ESB Networks has not published available generation capacity for BALLINEEN.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.