Renewable energy projects near Inniscarra

Solar, wind and battery applications in the planning register for Inniscarra and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

7
Projects here
5
Still live
not refused, withdrawn or lapsed
23.8
MW stated
from 3 applications that state one
57.5
Hectares of site area
across 4 applications

The map plots 7 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Inniscarra Application submitted 1 Permission granted 4 Permission refused 1 No decision recorded 1

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Inniscarra

Permission granted Capacity not stated21.3 ha siteLodged Dec 13, 2018 Ref 18/7280
Grid: CURRALEIGH (38 kV), 4.04 km away. No firm generation capacity currently available at CURRALEIGH.

Battery storage + Solar — Inniscarra

Application submitted Capacity not stated7.5 ha siteLodged Aug 14, 2026 Ref 26/2143
Grid: CURRALEIGH (38 kV), 0.41 km away. No firm generation capacity currently available at CURRALEIGH.

Solar — Inniscarra

Permission granted 5.0 MW statedLodged Nov 20, 2015 Ref 15/6625
Grid: CURRALEIGH (38 kV), 0.25 km away. No firm generation capacity currently available at CURRALEIGH.

Solar — Inniscarra

Permission granted 5.0 MW statedLodged Feb 26, 2021 Ref 21/4505
Grid: CURRALEIGH (38 kV), 0.25 km away. No firm generation capacity currently available at CURRALEIGH.

Solar — Inniscarra

Permission granted Capacity not statedLodged Apr 26, 2022 Ref 22/4909
Grid: CURRALEIGH (38 kV), 0.24 km away. No firm generation capacity currently available at CURRALEIGH.

Solar — Inniscarra

Permission refused 13.8 MW stated21.25 ha siteLodged Dec 5, 2024 Ref 24/6312
Grid: CURRALEIGH (38 kV), 4.04 km away. No firm generation capacity currently available at CURRALEIGH.

Battery storage + Solar — Inniscarra

No decision recorded Capacity not stated7.5 ha siteLodged Jun 26, 2026 Ref 26/1721
Grid: CURRALEIGH (38 kV), 0.41 km away. No firm generation capacity currently available at CURRALEIGH.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Cork