Renewable energy projects near Letterlicky Middle Bantry

Solar, wind and battery applications in the planning register for Letterlicky Middle Bantry and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

4
Projects here
0
Still live
not refused, withdrawn or lapsed
Not stated
Capacity
no application here states a figure in MW
Hectares of site area
across 0 applications

The map plots 4 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Letterlicky Middle Bantry Permission refused 1 Withdrawn 1 No decision recorded 2

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Wind — Letterlicky Middle Bantry

Withdrawn Capacity not statedLodged Dec 15, 2022 Ref 22/767
Grid: GLANTA COMMONS (38 kV), 4.93 km away. 3.5 MW of firm generation capacity available at BALLYDEHOB.

Wind — Letterlicky Middle Bantry

No decision recorded Capacity not statedLodged Dec 23, 2022 Ref 22/800
Grid: GLANTA COMMONS (38 kV), 3.2 km away. 3.5 MW of firm generation capacity available at BALLYDEHOB.

Wind — Letterlicky Middle Bantry

Permission refused Capacity not statedLodged Mar 13, 2023 Ref 23/130
Grid: BALLYDEHOB (38 kV), 3.02 km away. 3.5 MW of firm generation capacity available at BALLYDEHOB.

Wind — Letterlicky Middle Bantry

No decision recorded Capacity not statedLodged Feb 16, 2023 Ref 23/70
Grid: GLANTA COMMONS (38 kV), 3.2 km away. 3.5 MW of firm generation capacity available at BALLYDEHOB.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Cork