Renewable energy projects near Lysaghtstown

Solar, wind and battery applications in the planning register for Lysaghtstown and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

8
Projects here
6
Still live
not refused, withdrawn or lapsed
Not stated
Capacity
no application here states a figure in MW
Hectares of site area
across 0 applications

The map plots 8 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Lysaghtstown Permission granted 6 Withdrawn 1 No decision recorded 1

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Battery storage + Solar — Lysaghtstown

Permission granted Capacity not statedLodged Oct 19, 2018 Ref 18/6769
Grid: AVONCORE (38 kV), 2.62 km away. ESB Networks has not published available generation capacity for AVONCORE.

Solar — Lysaghtstown

Permission granted Capacity not statedLodged Jul 9, 2019 Ref 19/5729
Grid: MIDLETON (110 kV), 3.72 km away. 20.1 MW of firm generation capacity available at MIDLETON.

Solar — Lysaghtstown

Permission granted Capacity not statedLodged Dec 4, 2019 Ref 19/6882
Grid: MIDLETON (110 kV), 2.61 km away. 20.1 MW of firm generation capacity available at MIDLETON.

Battery storage + Solar — Lysaghtstown

Permission granted Capacity not statedLodged Jan 13, 2021 Ref 20/6891
Grid: AVONCORE (38 kV), 2.5 km away. 20.1 MW of firm generation capacity available at MIDLETON.

Solar — Lysaghtstown

Permission granted Capacity not statedLodged Apr 26, 2021 Ref 21/5089
Grid: AVONCORE (38 kV), 2.14 km away. 20.1 MW of firm generation capacity available at MIDLETON.

Solar — Lysaghtstown

Permission granted Capacity not statedLodged Jun 16, 2025 Ref 25/5141
Grid: MIDLETON (110 kV), 1.91 km away. 20.1 MW of firm generation capacity available at MIDLETON.

Solar — Lysaghtstown

No decision recorded Capacity not statedLodged Mar 29, 2021 Ref 21/4787
Grid: AVONCORE (38 kV), 2.47 km away. 20.1 MW of firm generation capacity available at MIDLETON.

Solar — Lysaghtstown

Withdrawn Capacity not statedLodged Dec 13, 2022 Ref 22/6756
Grid: MIDLETON (110 kV), 1.89 km away. 20.1 MW of firm generation capacity available at MIDLETON.