Renewable energy projects near Timoleague

Solar, wind and battery applications in the planning register for Timoleague and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

7
Projects here
7
Still live
not refused, withdrawn or lapsed
20.0
MW stated
from 4 applications that state one
8.6
Hectares of site area
across 2 applications

The map plots 7 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Timoleague Permission granted 7

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Timoleague

Permission granted 5.0 MW stated8.6 ha siteLodged Nov 20, 2025 Ref 25/6532
Grid: TIMOLEAGUE (38 kV), 0.43 km away. No firm generation capacity currently available at TIMOLEAGUE.

Battery storage + Solar — Timoleague

Permission granted Capacity not stated0.043 ha siteLodged May 22, 2026 Ref 26/1372
Grid: TIMOLEAGUE (38 kV), 0.27 km away. No firm generation capacity currently available at TIMOLEAGUE.

Solar — Timoleague

Permission granted 5.0 MW statedLodged Dec 23, 2015 Ref 15/6968
Grid: TIMOLEAGUE (38 kV), 0.43 km away. No firm generation capacity currently available at TIMOLEAGUE.

Solar — Timoleague

Permission granted 5.0 MW statedLodged Jul 6, 2018 Ref 18/406
Grid: CLONAKILTY (38 kV), 1.97 km away. 4.6 MW of firm generation capacity available at CLONAKILTY.

Solar — Timoleague

Permission granted 5.0 MW statedLodged Feb 26, 2021 Ref 21/4496
Grid: TIMOLEAGUE (38 kV), 0.43 km away. No firm generation capacity currently available at TIMOLEAGUE.

Solar — Timoleague

Permission granted Capacity not statedLodged Oct 28, 2022 Ref 22/6452
Grid: TIMOLEAGUE (38 kV), 0.43 km away. No firm generation capacity currently available at TIMOLEAGUE.

Solar — Timoleague

Permission granted Capacity not statedLodged Jun 27, 2023 Ref 23/5320
Grid: TIMOLEAGUE (38 kV), 0.35 km away. No firm generation capacity currently available at TIMOLEAGUE.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.