Renewable energy projects near Lifford Po

Solar, wind and battery applications in the planning register for Lifford Po and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

11
Projects here
4
Still live
not refused, withdrawn or lapsed
2.5
MW stated
from 1 application that state one
80.6
Hectares of site area
across 11 applications

The map plots 11 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Lifford Po Further information reque… 1 Under appeal 1 Permission granted 2 Permission refused 3 Withdrawn 2 Permission lapsed 1 No decision recorded 1

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Lifford Po

Further information requested Capacity not stated13.88 ha siteLodged Dec 19, 2025 Ref 2562310
Grid: CONVOY (38 kV), 0.61 km away. No firm generation capacity currently available at CONVOY.

Wind — Lifford Po

Permission granted Capacity not stated9.9 ha siteLodged May 1, 2026 Ref 2660788
Grid: MULLASAWNY (38 kV), 0.28 km away. ESB Networks has not published available generation capacity for MULLASAWNY.

Solar — Lifford Po

Permission granted Capacity not stated9.67 ha siteLodged Dec 11, 2025 Ref 2562206
Grid: BALLYMACARRY (38 kV), 2.16 km away. No firm generation capacity currently available at BALLYMACARRY.

Battery storage — Lifford Po

Under appeal Capacity not stated5.8 ha siteLodged Sep 23, 2024 Ref 2461497
Grid: TRILLICK (110 kV), 0.43 km away. No firm generation capacity currently available at TRILLICK.

Wind — Lifford Po

Permission refused Capacity not stated9.24 ha siteLodged Aug 17, 2023 Ref 2351218
Grid: CROCKAHENNY (38 kV), 2.89 km away. ESB Networks has not published available generation capacity for CROCKAHENNY.

Wind — Lifford Po

Permission refused Capacity not stated7.6 ha siteLodged Mar 16, 2018 Ref 1850380
Grid: CROCKAHENNY (38 kV), 2.95 km away. ESB Networks has not published available generation capacity for CROCKAHENNY.

Wind — Lifford Po

Withdrawn Capacity not stated7.41 ha siteLodged Jan 12, 2017 Ref 1750018
Grid: CARK (38 kV), 0.72 km away. ESB Networks has not published available generation capacity for CARK.

Wind — Lifford Po

Withdrawn Capacity not stated6.2 ha siteLodged Mar 29, 2018 Ref 1850471
Grid: CROCKAHENNY (38 kV), 2.38 km away. ESB Networks has not published available generation capacity for CROCKAHENNY.

Wind — Lifford Po

Permission refused Capacity not stated4.66 ha siteLodged Dec 3, 2018 Ref 1851856
Grid: SORNE HILL (110 kV), 0.5 km away. No firm generation capacity currently available at BUNCRANA.

Solar — Lifford Po

No decision recorded Capacity not stated3.738 ha siteLodged Jun 21, 2026 Ref 2661140
Grid: STRABANE (voltage not published), 1.26 km away. ESB Networks has not published available generation capacity for STRABANE.

Wind — Lifford Po

Permission lapsed 2.5 MW stated2.46 ha siteLodged May 14, 2018 Ref 1850746
Grid: SORNE HILL (110 kV), 0.87 km away. No firm generation capacity currently available at BUNCRANA.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Donegal