Renewable energy projects near Dublin 12

Solar, wind and battery applications in the planning register for Dublin 12 and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

6
Projects here
2
Still live
not refused, withdrawn or lapsed
Not stated
Capacity
no application here states a figure in MW
26.0
Hectares of site area
across 6 applications

The map plots 6 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Dublin 12 Permission granted 2 Permission refused 1 No decision recorded 3

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Dublin 12

Permission granted Capacity not stated5.5184 ha siteLodged Dec 1, 2023 Ref 4900/23
Grid: HAROLDS CROSS (110 kV), 1.21 km away. 12.8 MW of firm generation capacity available at CRUMLIN.

Solar — Dublin 12

Permission granted Capacity not stated2.625343 ha siteLodged May 21, 2021 Ref 2812/21
Grid: INCHICORE NORTH (38 kV), 0.81 km away. 9.9 MW of firm generation capacity available at INCHICORE NORTH.

Solar — Dublin 12

No decision recorded Capacity not stated5.5184 ha siteLodged Oct 18, 2022 Ref 5068/22
Grid: HAROLDS CROSS (110 kV), 1.21 km away. 12.8 MW of firm generation capacity available at CRUMLIN.

Solar — Dublin 12

Permission refused Capacity not stated5.5184 ha siteLodged Nov 8, 2022 Ref 5194/22
Grid: HAROLDS CROSS (110 kV), 1.21 km away. 12.8 MW of firm generation capacity available at CRUMLIN.

Solar — Dublin 12

No decision recorded Capacity not stated4.194844 ha siteLodged Apr 27, 2026 Ref WEB1995/26
Grid: KIMMAGE (38 kV), 0.56 km away. 12.8 MW of firm generation capacity available at CRUMLIN.

Solar — Dublin 12

No decision recorded Capacity not stated2.625343 ha siteLodged May 13, 2021 Ref 2761/21
Grid: INCHICORE NORTH (38 kV), 0.81 km away. 9.9 MW of firm generation capacity available at INCHICORE NORTH.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of Dublin City