Renewable energy projects near Tuam

Solar, wind and battery applications in the planning register for Tuam and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

6
Projects here
5
Still live
not refused, withdrawn or lapsed
4.8
MW stated
from 1 application that state one
158.0
Hectares of site area
across 6 applications

The map plots 6 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Tuam Permission granted 5 Permission lapsed 1

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Tuam

Permission granted Capacity not stated60.7 ha siteLodged Feb 7, 2026 Ref 2660183
Grid: CLOON (110 kV), 0.73 km away. 5.8 MW of firm generation capacity available at TUAM SOUTH.

Solar — Tuam

Permission granted Capacity not stated48.01 ha siteLodged Sep 10, 2025 Ref 2561293
Grid: CLOON (110 kV), 2.07 km away. 5.8 MW of firm generation capacity available at TUAM SOUTH.

Wind — Tuam

Permission granted 4.8 MW stated4.3 ha siteLodged Nov 17, 2022 Ref 221175
Grid: CLOON (110 kV), 1.11 km away. 5.8 MW of firm generation capacity available at TUAM SOUTH.

Solar — Tuam

Permission granted Capacity not stated3.18 ha siteLodged Aug 30, 2024 Ref 2461139
Grid: TUAM SOUTH (38 kV), 1.5 km away. 5.8 MW of firm generation capacity available at TUAM SOUTH.

Battery storage — Tuam

Permission granted Capacity not stated0.024 ha siteLodged Aug 14, 2023 Ref 2360954
Grid: CLOON (110 kV), 1.91 km away. 5.8 MW of firm generation capacity available at TUAM SOUTH.

Solar — Tuam

Permission lapsed Capacity not stated41.83 ha siteLodged Sep 10, 2024 Ref 2461190
Grid: CLOON (110 kV), 0.75 km away. 9.1 MW of firm generation capacity available at CLOON.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Galway