Renewable energy projects near Astee

Solar, wind and battery applications in the planning register for Astee and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

3
Projects here
0
Still live
not refused, withdrawn or lapsed
5.0
MW stated
from 1 application that state one
Hectares of site area
across 0 applications

The map plots 3 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Astee Permission lapsed 2 No decision recorded 1

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Astee

No decision recorded 5.0 MW statedLodged Aug 25, 2021 Ref 159772
Grid: BALLYBUNION (38 kV), 8.33 km away. No firm generation capacity currently available at BALLYBUNION.

Wind — Astee

Permission lapsed Capacity not statedLodged Nov 17, 2017 Ref 171147
Grid: BALLYBUNION (38 kV), 7.01 km away. No firm generation capacity currently available at BALLYBUNION.

Wind — Astee

Permission lapsed Capacity not statedLodged Nov 17, 2017 Ref 171148
Grid: DROMBEG (110 kV), 7.24 km away. ESB Networks has not published available generation capacity for DROMBEG.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Kerry