Renewable energy projects near Athy

Solar, wind and battery applications in the planning register for Athy and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

7
Projects here
2
Still live
not refused, withdrawn or lapsed
Not stated
Capacity
no application here states a figure in MW
44.3
Hectares of site area
across 7 applications

The map plots 7 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Athy Permission granted 2 Permission refused 2 Withdrawn 1 Permission lapsed 2

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Athy

Permission granted Capacity not stated3.95 ha siteLodged Dec 20, 2021 Ref 211788
Grid: STRADBALLY ROAD (38 kV), 1.29 km away. 22 MW of firm generation capacity available at ATHY.

Solar + Wind — Athy

Permission granted Capacity not stated1.1 ha siteLodged Apr 4, 2025 Ref 2560354
Grid: STRADBALLY ROAD (38 kV), 7.05 km away. 22 MW of firm generation capacity available at ATHY.

Solar — Athy

Permission lapsed Capacity not stated12.02 ha siteLodged Mar 29, 2019 Ref 19336
Grid: STRADBALLY ROAD (38 kV), 2.01 km away. 22 MW of firm generation capacity available at ATHY.

Solar — Athy

Withdrawn Capacity not stated12.02 ha siteLodged Mar 10, 2022 Ref 22265
Grid: STRADBALLY ROAD (38 kV), 2.01 km away. 22 MW of firm generation capacity available at ATHY.

Solar — Athy

Permission refused Capacity not stated10.6 ha siteLodged Jan 19, 2017 Ref 1739
Grid: STRADBALLY ROAD (38 kV), 1.98 km away. 22 MW of firm generation capacity available at ATHY.

Battery storage — Athy

Permission lapsed Capacity not stated2.32 ha siteLodged Sep 27, 2018 Ref 181183
Grid: ATHY (110 kV), 0.41 km away. 22 MW of firm generation capacity available at ATHY.

Battery storage — Athy

Permission refused Capacity not stated2.32 ha siteLodged Oct 23, 2023 Ref 23961
Grid: ATHY (110 kV), 0.4 km away. 22 MW of firm generation capacity available at ATHY.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Kildare