Renewable energy projects near Curragh

Solar, wind and battery applications in the planning register for Curragh and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

7
Projects here
1
Still live
not refused, withdrawn or lapsed
4.0
MW stated
from 1 application that state one
26.5
Hectares of site area
across 7 applications

The map plots 7 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Curragh Permission granted 1 Permission lapsed 2 No decision recorded 4

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Battery storage — Curragh

Permission granted Capacity not stated3.52 ha siteLodged Dec 8, 2022 Ref 221456
Grid: KILCULLEN (38 kV), 2.71 km away. No firm generation capacity currently available at KILCULLEN.

Solar — Curragh

Permission lapsed 4.0 MW stated6.08 ha siteLodged Jun 16, 2017 Ref 17707
Grid: MORRISTOWN (38 kV), 1.86 km away. 5.3 MW of firm generation capacity available at MORRISTOWN.

Battery storage — Curragh

No decision recorded Capacity not stated3.52 ha siteLodged Sep 6, 2022 Ref 221091
Grid: KILCULLEN (38 kV), 2.58 km away. No firm generation capacity currently available at KILCULLEN.

Battery storage — Curragh

No decision recorded Capacity not stated3.47 ha siteLodged Aug 26, 2022 Ref 221046
Grid: KILCULLEN (38 kV), 2.68 km away. No firm generation capacity currently available at KILCULLEN.

Battery storage — Curragh

No decision recorded Capacity not stated3.47 ha siteLodged Nov 16, 2022 Ref 221366
Grid: KILCULLEN (38 kV), 2.66 km away. No firm generation capacity currently available at KILCULLEN.

Battery storage — Curragh

No decision recorded Capacity not stated3.47 ha siteLodged Nov 29, 2022 Ref 221420
Grid: KILCULLEN (38 kV), 2.63 km away. No firm generation capacity currently available at KILCULLEN.

Solar — Curragh

Permission lapsed Capacity not stated2.97 ha siteLodged Jul 28, 2017 Ref 17862
Grid: KILDARE (38 kV), 4.57 km away. 15.3 MW of firm generation capacity available at KILDARE.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.