Renewable energy projects near Moneymore Drogheda

Solar, wind and battery applications in the planning register for Moneymore Drogheda and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

2
Projects here
1
Still live
not refused, withdrawn or lapsed
Not stated
Capacity
no application here states a figure in MW
7.2
Hectares of site area
across 2 applications

The map plots 2 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Moneymore Drogheda Permission granted 1 No decision recorded 1

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Moneymore Drogheda

Permission granted Capacity not stated3.612 ha siteLodged Jan 22, 2025 Ref 2560030
Grid: MORNINGTON ROAD (38 kV), 1.48 km away. 11.7 MW of firm generation capacity available at MORNINGTON ROAD.

Solar — Moneymore Drogheda

No decision recorded Capacity not stated3.612 ha siteLodged Nov 5, 2024 Ref 2460680
Grid: MORNINGTON ROAD (38 kV), 1.48 km away. 11.7 MW of firm generation capacity available at MORNINGTON ROAD.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Louth