Renewable energy projects near Claremorris

Solar, wind and battery applications in the planning register for Claremorris and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

6
Projects here
1
Still live
not refused, withdrawn or lapsed
Not stated
Capacity
no application here states a figure in MW
1.1
Hectares of site area
across 1 application

The map plots 6 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Claremorris Permission granted 1 Permission refused 1 Permission lapsed 3 No decision recorded 1

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Claremorris

Permission granted Capacity not statedLodged Jun 13, 2024 Ref 24224
Grid: DALTON (110 kV), 0.09 km away. ESB Networks has not published available generation capacity for CLAREMORRIS.

Battery storage — Claremorris

Permission refused Capacity not stated1.14 ha siteLodged Jan 18, 2018 Ref 1823
Grid: DALTON (110 kV), 0.18 km away. ESB Networks has not published available generation capacity for CLAREMORRIS.

Wind — Claremorris

Permission lapsed Capacity not statedLodged Oct 10, 2019 Ref 19792
Grid: CLOONFAUGHNA (38 kV), 2.38 km away. ESB Networks has not published available generation capacity for CLAREMORRIS.

Wind — Claremorris

No decision recorded Capacity not statedLodged Oct 10, 2019 Ref 19793
Grid: CLOONFAUGHNA (38 kV), 0.97 km away. ESB Networks has not published available generation capacity for CLOONFAUGHNA.

Wind — Claremorris

Permission lapsed Capacity not statedLodged Oct 10, 2019 Ref 19794
Grid: DALTON (110 kV), 3.19 km away. ESB Networks has not published available generation capacity for CLAREMORRIS.

Wind — Claremorris

Permission lapsed Capacity not statedLodged Dec 19, 2019 Ref 19985
Grid: CLOONFAUGHNA (38 kV), 0.97 km away. ESB Networks has not published available generation capacity for CLOONFAUGHNA.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Mayo