Renewable energy projects near Ashbourne

Solar, wind and battery applications in the planning register for Ashbourne and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

10
Projects here
5
Still live
not refused, withdrawn or lapsed
98.0
MW stated
from 3 applications that state one
353.5
Hectares of site area
across 10 applications

The map plots 10 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Ashbourne Permission granted 5 Permission refused 1 Permission lapsed 1 No decision recorded 3

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Ashbourne

Permission granted 35.0 MW stated56.76 ha siteLodged Jul 25, 2017 Ref AA170860
Grid: BALTRASNA (110 kV), 2.98 km away. 2.3 MW of firm generation capacity available at BALTRASNA.

Solar — Ashbourne

Permission granted 31.5 MW stated54.57 ha siteLodged May 4, 2017 Ref RA170479
Grid: ASHBOURNE (38 kV), 3.22 km away. 3 MW of firm generation capacity available at ASHBOURNE.

Solar — Ashbourne

Permission granted Capacity not stated42.88 ha siteLodged Nov 12, 2021 Ref 212165
Grid: BALTRASNA (110 kV), 2.36 km away. 2.3 MW of firm generation capacity available at BALTRASNA.

Solar — Ashbourne

Permission granted Capacity not stated23.58 ha siteLodged Sep 30, 2021 Ref 211918
Grid: BALTRASNA (110 kV), 4 km away. 3 MW of firm generation capacity available at ASHBOURNE.

Solar — Ashbourne

Permission granted Capacity not stated7.73 ha siteLodged Sep 20, 2024 Ref 24381
Grid: BALTRASNA (110 kV), 3.55 km away. 3 MW of firm generation capacity available at ASHBOURNE.

Solar — Ashbourne

No decision recorded Capacity not stated62.96 ha siteLodged Jul 8, 2025 Ref 2560707
Grid: BALTRASNA (110 kV), 0.32 km away. 2.3 MW of firm generation capacity available at BALTRASNA.

Solar — Ashbourne

No decision recorded 31.5 MW stated54.57 ha siteLodged Apr 12, 2017 Ref RA170384
Grid: ASHBOURNE (38 kV), 3.16 km away. 3 MW of firm generation capacity available at ASHBOURNE.

Solar — Ashbourne

Permission refused Capacity not stated23.58 ha siteLodged Apr 19, 2021 Ref 21732
Grid: BALTRASNA (110 kV), 3.73 km away. 3 MW of firm generation capacity available at ASHBOURNE.

Solar — Ashbourne

No decision recorded Capacity not stated17.54 ha siteLodged Sep 16, 2021 Ref 211814
Grid: ASHBOURNE (38 kV), 0.25 km away. 3 MW of firm generation capacity available at ASHBOURNE.

Solar — Ashbourne

Permission lapsed Capacity not stated9.29 ha siteLodged Oct 8, 2018 Ref AA181174
Grid: ASHBOURNE (38 kV), 3.83 km away. 3 MW of firm generation capacity available at ASHBOURNE.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Meath