Renewable energy projects in County Meath

Every solar, wind and battery application in the county's planning register, joined to the ESB Networks substation nearest it and the generation capacity that substation has available. Updated from public records; last checked Sep 1, 2026.

Enter an Eircode, or a town, village or townland name. Only the routing key — the first three characters — is used and it is never stored: that places you within a few kilometres of your town, which is all this needs, and Eircode's full address database is licensed and not public anyway. All 139 routing keys in the country are covered.

161
Utility-scale projects
solar, wind and battery
96
Still live in the system
not refused, withdrawn or lapsed
368.2
MW stated
from 19 of 161 applications that state one
9130.3
Hectares of site area
across 157 applications
25
Substations with no capacity
of 255 near these projects
3
Under appeal now
34 have been appealed at some point

Where they are

The map plots 161 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Positions are as published in the national planning register, or — for applications made directly to An Coimisiun Pleanala — at the centre of the site boundary that case publishes. Colour shows planning status.

Planning status

Planning status of renewable projects in County Meath Application submitted 3 Further information reque… 2 Under appeal 3 Permission granted 88 Permission refused 7 Withdrawn 5 Permission lapsed 15 No decision recorded 38

Technologies

Technologies in the County Meath pipeline Solar 142 Battery storage 30 Wind 4 Grid infrastructure 1

A project appears under each technology it includes, so co-located solar-and-battery schemes are counted in both.

Grid capacity

80 of 161 projects are matched to a named substation with enough confidence to publish the link (49.7%). The remaining 81 are listed as unmatched rather than guessed — matching a project to the wrong substation is worse than leaving it unmatched, so a name match must also be corroborated by distance before it counts.

31 projects sit at a substation ESB Networks currently publishes as having no firm generation capacity available.

Areas

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Live applications

Solar — Kilbride

Permission granted KilbrideCapacity not stated265.8 ha siteLodged May 4, 2021 Ref 21837
Grid: ASHBOURNE (38 kV), 3.16 km away. 3 MW of firm generation capacity available at ASHBOURNE.

Solar — Kinoristown

Permission granted KinoristownCapacity not stated215.0 ha siteLodged Sep 13, 2024 Ref 2460742
Grid: CLONEE (220 kV), 3.23 km away. ESB Networks has not published available generation capacity for CLONEE.

Solar — Summerhill

Permission granted SummerhillCapacity not stated206.0 ha siteLodged Nov 22, 2021 Ref 212214
Grid: CLARKSTOWN (38 kV), 3.83 km away. 2.6 MW of firm generation capacity available at CLARKSTOWN.

Solar — Kilcock

Permission granted KilcockCapacity not stated205.1 ha siteLodged Dec 19, 2023 Ref 231144
Grid: KILCOCK (38 kV), 3.87 km away. 2.6 MW of firm generation capacity available at KILCOCK.

Solar — Duleek

Permission granted DuleekCapacity not stated188.9 ha siteLodged Jun 1, 2023 Ref 23576
Grid: DULEEK (38 kV), 4.88 km away. No firm generation capacity currently available at DULEEK.

Solar — Drumree

Permission granted DrumreeCapacity not stated171.3 ha siteLodged Nov 18, 2022 Ref 221508
Grid: PORTAN (400 kV), 1.76 km away. ESB Networks has not published available generation capacity for PORTAN.

Solar — Corballis

Under appeal CorballisCapacity not stated149.0 ha siteLodged Sep 24, 2025 Ref 2561010
Grid: GORMAN (220 kV), 2.94 km away. ESB Networks has not published available generation capacity for GORMAN.

Battery storage + Solar — Kells

Further information requested KellsCapacity not stated137.0 ha siteLodged Mar 5, 2026 Ref 2660267
Grid: KELLS (38 kV), 3.34 km away. 5.5 MW of firm generation capacity available at KELLS.

Solar — Navan

Permission granted NavanCapacity not stated131.9 ha siteLodged Nov 27, 2023 Ref 231082
Grid: SLANE (38 kV), 7.17 km away. 30.7 MW of firm generation capacity available at NAVAN.

Battery storage + Solar — Duleek

Permission granted DuleekCapacity not stated131.3 ha siteLodged Mar 1, 2022 Ref 22262
Grid: DULEEK (38 kV), 1.7 km away. No firm generation capacity currently available at DULEEK.

Solar — Dunboyne

Permission granted DunboyneCapacity not stated129.5 ha siteLodged Aug 9, 2023 Ref 23787
Grid: PORTAN (400 kV), 3.58 km away. ESB Networks has not published available generation capacity for PORTAN.

Solar — Dunboyne

Permission granted DunboyneCapacity not stated129.0 ha siteLodged Jul 28, 2017 Ref RA170873
Grid: PORTAN (400 kV), 3.62 km away. ESB Networks has not published available generation capacity for PORTAN.

Solar — Kells

Permission granted KellsCapacity not stated121.5 ha siteLodged Mar 2, 2021 Ref 21396
Grid: GARISTOWN (38 kV), 2.33 km away. 5.5 MW of firm generation capacity available at KELLS.

Wind — Galboystown

Permission granted GalboystownCapacity not stated115.33 ha siteLodged Apr 2, 2024 Ref ABP-319448
Grid: DELVIN (38 kV), 5.83 km away. No firm generation capacity currently available at DELVIN.

Solar — Summerhill

Permission granted SummerhillCapacity not stated108.6 ha siteLodged May 25, 2021 Ref 21985
Grid: CLARKSTOWN (38 kV), 4.73 km away. 2.6 MW of firm generation capacity available at CLARKSTOWN.

Solar — Navan

Permission granted NavanCapacity not stated97.05 ha siteLodged Aug 9, 2022 Ref 221044
Grid: SLANE (38 kV), 9.02 km away. 30.7 MW of firm generation capacity available at NAVAN.

Solar — Ratoath Manor

Permission granted Ratoath ManorCapacity not stated95.3 ha siteLodged Jun 9, 2017 Ref RA170644
Grid: ASHBOURNE (38 kV), 4.64 km away. 3 MW of firm generation capacity available at ASHBOURNE.

Solar — Clongall

Permission granted ClongallCapacity not stated93.1 ha siteLodged Oct 17, 2018 Ref TA181225
Grid: KINNEGAD (110 kV), 5.27 km away. ESB Networks has not published available generation capacity for KINNEGAD.

Battery storage + Solar — Summerhill

Permission granted SummerhillCapacity not stated91.9 ha siteLodged Mar 25, 2021 Ref 21546
Grid: CLARKSTOWN (38 kV), 3.8 km away. 2.6 MW of firm generation capacity available at CLARKSTOWN.

Solar — Ward

Permission granted WardCapacity not stated87.63 ha siteLodged May 30, 2017 Ref AA170600
Grid: CORDUFF (220 kV), 3.38 km away. 38.7 MW of firm generation capacity available at CORDUFF.

Solar — Ward

Permission granted WardCapacity not stated87.63 ha siteLodged Aug 13, 2020 Ref AA201085
Grid: CORDUFF (220 kV), 3.44 km away. 38.7 MW of firm generation capacity available at CORDUFF.

Battery storage + Solar — Ratoath

Permission granted RatoathCapacity not stated82.5 ha siteLodged Feb 3, 2021 Ref 21180
Grid: ASHBOURNE (38 kV), 4.29 km away. 3 MW of firm generation capacity available at ASHBOURNE.

Battery storage + Solar — Duleek

Permission granted DuleekCapacity not stated81.3 ha siteLodged Apr 9, 2020 Ref LB200487
Grid: DULEEK (38 kV), 1.95 km away. No firm generation capacity currently available at DULEEK.

Battery storage + Solar — Kells

Under appeal KellsCapacity not stated74.2 ha siteLodged Dec 20, 2024 Ref 2560014
Grid: KELLS (38 kV), 2.66 km away. 5.5 MW of firm generation capacity available at KELLS.

Grid infrastructure — Ratoath

Permission granted RatoathCapacity not stated68.8 ha siteLodged Feb 6, 2025 Ref 2560112
Grid: BALTRASNA (110 kV), 3.08 km away. 2.3 MW of firm generation capacity available at BALTRASNA.

Battery storage + Solar — Crackenstown

Permission granted CrackenstownCapacity not stated68.8 ha siteLodged Aug 4, 2020 Ref AA201054
Grid: BALTRASNA (110 kV), 3.07 km away. 2.3 MW of firm generation capacity available at BALTRASNA.

Solar — Muckerstown

Permission granted MuckerstownCapacity not stated68.4 ha siteLodged Oct 18, 2022 Ref 221368
Grid: ASHBOURNE (38 kV), 1.99 km away. 3 MW of firm generation capacity available at ASHBOURNE.

Solar — Muckerstown

Permission granted MuckerstownCapacity not stated68.4 ha siteLodged Nov 21, 2018 Ref AA181386
Grid: ASHBOURNE (38 kV), 1.85 km away. 3 MW of firm generation capacity available at ASHBOURNE.

Solar — Curragha

Permission granted CurraghaCapacity not stated62.96 ha siteLodged Jul 17, 2025 Ref 2560750
Grid: BALTRASNA (110 kV), 0.32 km away. 2.3 MW of firm generation capacity available at BALTRASNA.

Solar — Ashbourne

Permission granted Ashbourne35.0 MW stated56.76 ha siteLodged Jul 25, 2017 Ref AA170860
Grid: BALTRASNA (110 kV), 2.98 km away. 2.3 MW of firm generation capacity available at BALTRASNA.

Solar — Ashbourne

Permission granted Ashbourne31.5 MW stated54.57 ha siteLodged May 4, 2017 Ref RA170479
Grid: ASHBOURNE (38 kV), 3.22 km away. 3 MW of firm generation capacity available at ASHBOURNE.

Solar — Ashbourne

Permission granted AshbourneCapacity not stated42.88 ha siteLodged Nov 12, 2021 Ref 212165
Grid: BALTRASNA (110 kV), 2.36 km away. 2.3 MW of firm generation capacity available at BALTRASNA.

Battery storage + Solar — Drogheda

Permission granted DroghedaCapacity not stated41.3 ha siteLodged May 9, 2023 Ref 23495
Grid: BETTYSTOWN (38 kV), 2.05 km away. ESB Networks has not published available generation capacity for BETTYSTOWN.

Solar — Summerhill

Permission granted SummerhillCapacity not stated40.1 ha siteLodged Nov 19, 2024 Ref 2460979
Grid: CLARKSTOWN (38 kV), 3.85 km away. 2.6 MW of firm generation capacity available at CLARKSTOWN.

Battery storage + Solar — Ratoath

Application submitted RatoathCapacity not stated36.3 ha siteLodged Jul 30, 2026 Ref 2660951
Grid: BALTRASNA (110 kV), 1.59 km away. 2.3 MW of firm generation capacity available at BALTRASNA.

Solar — Kells

Permission granted KellsCapacity not stated35.81 ha siteLodged Feb 26, 2024 Ref 2460134
Grid: GARISTOWN (38 kV), 2.12 km away. 5.5 MW of firm generation capacity available at KELLS.

Solar — Killsallaghan

Permission granted KillsallaghanCapacity not stated34.4 ha siteLodged Jul 28, 2021 Ref 211436
Grid: ASHBOURNE (38 kV), 1.25 km away. 3 MW of firm generation capacity available at ASHBOURNE.

Solar — Navan

Permission granted NavanCapacity not stated33.97 ha siteLodged Feb 23, 2024 Ref 2460131
Grid: KNOCKUMBER (110 kV), 0.99 km away. ESB Networks has not published available generation capacity for KNOCKUMBER.

Solar — Mullagh

Application submitted MullaghCapacity not stated30.72 ha siteLodged Jul 8, 2026 Ref 2660850
Grid: MULLAGH (38 kV), 0.92 km away. No firm generation capacity currently available at MULLAGH.

Battery storage — Kilclone

Permission granted KilcloneCapacity not stated26.08 ha siteLodged Sep 2, 2024 Ref ABP-320738
Grid: KILCOCK (38 kV), 3.92 km away. 2.6 MW of firm generation capacity available at KILCOCK.