Renewable energy projects near Summerhill

Solar, wind and battery applications in the planning register for Summerhill and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

7
Projects here
5
Still live
not refused, withdrawn or lapsed
8.0
MW stated
from 1 application that state one
584.2
Hectares of site area
across 7 applications

The map plots 7 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Summerhill Permission granted 5 Permission lapsed 1 No decision recorded 1

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Summerhill

Permission granted Capacity not stated206.0 ha siteLodged Nov 22, 2021 Ref 212214
Grid: CLARKSTOWN (38 kV), 3.83 km away. 2.6 MW of firm generation capacity available at CLARKSTOWN.

Solar — Summerhill

Permission granted Capacity not stated108.6 ha siteLodged May 25, 2021 Ref 21985
Grid: CLARKSTOWN (38 kV), 4.73 km away. 2.6 MW of firm generation capacity available at CLARKSTOWN.

Battery storage + Solar — Summerhill

Permission granted Capacity not stated91.9 ha siteLodged Mar 25, 2021 Ref 21546
Grid: CLARKSTOWN (38 kV), 3.8 km away. 2.6 MW of firm generation capacity available at CLARKSTOWN.

Solar — Summerhill

Permission granted Capacity not stated40.1 ha siteLodged Nov 19, 2024 Ref 2460979
Grid: CLARKSTOWN (38 kV), 3.85 km away. 2.6 MW of firm generation capacity available at CLARKSTOWN.

Solar — Summerhill

Permission granted Capacity not stated5.4 ha siteLodged Apr 25, 2024 Ref 2460288
Grid: CLARKSTOWN (38 kV), 4.55 km away. 2.6 MW of firm generation capacity available at CLARKSTOWN.

Solar — Summerhill

No decision recorded Capacity not stated108.6 ha siteLodged May 18, 2021 Ref 21946
Grid: CLARKSTOWN (38 kV), 4.72 km away. 2.6 MW of firm generation capacity available at CLARKSTOWN.

Solar — Summerhill

Permission lapsed 8.0 MW stated23.6 ha siteLodged Jul 3, 2017 Ref RA170766
Grid: CLARKSTOWN (38 kV), 0.54 km away. 2.6 MW of firm generation capacity available at CLARKSTOWN.

Areas are derived from the address as published by the planning authority or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two places may appear under either.

← All of County Meath