10
Projects here
8
Still live
not refused, withdrawn or lapsed
Not stated
Capacity
no application here states a figure in MW
663.3
Hectares of site area
across 10 applications

The map plots 10 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Duleek Under appeal 1 Permission granted 7 Permission refused 1 No decision recorded 1

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Duleek

Permission granted Capacity not stated188.9 ha siteLodged Jun 1, 2023 Ref 23576
Grid: DULEEK (38 kV), 4.88 km away. No firm generation capacity currently available at DULEEK.

Battery storage + Solar — Duleek

Permission granted Capacity not stated131.3 ha siteLodged Mar 1, 2022 Ref 22262
Grid: DULEEK (38 kV), 1.7 km away. No firm generation capacity currently available at DULEEK.

Battery storage + Solar — Duleek

Permission granted Capacity not stated81.3 ha siteLodged Apr 9, 2020 Ref LB200487
Grid: DULEEK (38 kV), 1.95 km away. No firm generation capacity currently available at DULEEK.

Solar — Duleek

Under appeal Capacity not stated22.35 ha siteLodged Dec 12, 2025 Ref 2561187
Grid: CARRANSTOWN (38 kV), 1.5 km away. ESB Networks has not published available generation capacity for CARRANSTOWN.

Solar — Duleek

Permission granted Capacity not stated21.37 ha siteLodged Sep 20, 2021 Ref ABP-311427
Grid: DULEEK (38 kV), 1.56 km away. No firm generation capacity currently available at DULEEK.

Battery storage + Solar — Duleek

Permission granted Capacity not stated18.92 ha siteLodged Jul 22, 2022 Ref 22972
Grid: DULEEK (38 kV), 0.77 km away. No firm generation capacity currently available at DULEEK.

Solar — Duleek

Permission granted Capacity not stated2.4 ha siteLodged Sep 30, 2022 Ref 221290
Grid: DULEEK (38 kV), 2.72 km away. No firm generation capacity currently available at DULEEK.

Solar — Duleek

Permission granted Capacity not stated2.26 ha siteLodged Aug 3, 2021 Ref 211479
Grid: DULEEK (38 kV), 0.76 km away. No firm generation capacity currently available at DULEEK.

Solar — Duleek

No decision recorded Capacity not stated188.9 ha siteLodged May 11, 2023 Ref 23499
Grid: DULEEK (38 kV), 4.88 km away. No firm generation capacity currently available at DULEEK.

Solar — Duleek

Permission refused Capacity not stated5.578 ha siteLodged Nov 24, 2020 Ref SH308803
Grid: DULEEK (38 kV), 0.61 km away. No firm generation capacity currently available at DULEEK.