Renewable energy projects near Trim

Solar, wind and battery applications in the planning register for Trim and the townlands around it, with the nearest substation and the capacity it has available. Last checked Sep 1, 2026.

9
Projects here
5
Still live
not refused, withdrawn or lapsed
Not stated
Capacity
no application here states a figure in MW
72.3
Hectares of site area
across 9 applications

The map plots 9 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Planning status

Planning status near Trim Permission granted 5 Withdrawn 1 No decision recorded 3

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Every application here

Solar — Trim

Permission granted Capacity not stated9.59 ha siteLodged Jan 14, 2022 Ref 2230
Grid: TRIM (38 kV), 1.26 km away. 3.6 MW of firm generation capacity available at TRIM.

Solar — Trim

Permission granted Capacity not stated9.59 ha siteLodged Feb 22, 2018 Ref TA180167
Grid: TRIM (38 kV), 1.2 km away. 3.6 MW of firm generation capacity available at TRIM.

Solar — Trim

Permission granted Capacity not stated9.51 ha siteLodged Aug 5, 2020 Ref TA201048
Grid: TRIM (38 kV), 0.5 km away. 3.6 MW of firm generation capacity available at TRIM.

Solar — Trim

Permission granted Capacity not stated6.76 ha siteLodged Sep 25, 2024 Ref 24383
Grid: TRIM (38 kV), 2.56 km away. 3.6 MW of firm generation capacity available at TRIM.

Solar — Trim

Permission granted Capacity not stated2.04 ha siteLodged Jul 5, 2024 Ref 2460498
Grid: FOSTERSTOWN (110 kV), 3.66 km away. 3.6 MW of firm generation capacity available at TRIM.

Solar — Trim

Withdrawn Capacity not stated11.7 ha siteLodged Mar 27, 2017 Ref TA170317
Grid: TRIM (38 kV), 1.24 km away. 3.6 MW of firm generation capacity available at TRIM.

Solar — Trim

No decision recorded Capacity not stated9.59 ha siteLodged Dec 21, 2021 Ref 212391
Grid: TRIM (38 kV), 1.2 km away. 3.6 MW of firm generation capacity available at TRIM.

Solar — Trim

No decision recorded Capacity not stated6.76 ha siteLodged Aug 2, 2024 Ref 24327
Grid: TRIM (38 kV), 2.56 km away. 3.6 MW of firm generation capacity available at TRIM.

Solar — Trim

No decision recorded Capacity not stated6.76 ha siteLodged Aug 29, 2024 Ref 24358
Grid: TRIM (38 kV), 2.56 km away. 3.6 MW of firm generation capacity available at TRIM.