Solar, wind and battery applications in the planning register for
Derrinlough and the townlands around it, with the nearest substation and the
capacity it has available. Last checked Sep 1, 2026.
6
Projects here
2
Still live
not refused, withdrawn or lapsed
580.0
MW stated
from 4 applications that state one
2816.7
Hectares of site area
across 5 applications
The map plots 6 projects on a background supplied by
OpenStreetMap, which receives your IP address when it loads.
Planning status
Own land near one of these?
We track every solar, wind and battery application in the national planning register — and the
large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as
they move through planning, and which substations still have capacity to take a connection. If you
want to be told when something is lodged near your land, leave an email address.
No decision recorded145.0 MW statedLodged Dec 12, 2025Ref 25130
Grid: LUMCLOON (38 kV), 4.44 km away.
4.2 MW of firm generation capacity available at LUMCLOON.
Areas are derived from the address as published by the planning authority
or, for a direct application, by An Coimisiun Pleanala. A project on the boundary between two
places may appear under either.