Solar at Ballon

Rathrush Emlicon and Bendinstown , Ballon , Co. Carlow

Permission granted
Planning status
63.0
Capacity
as stated in the application
118.9
Site area (hectares)
Solar
Technology

This project holds a grid connection offer

EirGrid's connection batches record an offer for this application with a maximum export capacity of 63.0 MW, connecting at the Carlow node. EirGrid lists it as Garreenleen Solar Farm Phase 2 Extension, applicant Garreenleen Solar Farm Limited. The offer quarter is Q2 2026.

Source: ECP-GSS-1 Final Batch, May 2026. Matched to this application by the planning reference EirGrid publishes, confirmed against the county. An offer is a place in the connection process, not a connection: it does not mean the project is built or generating.

Grid

Nearest substation: KELLIS (220 kV), 3.19 km away.
Association: No confident match to a named grid station.
Available capacity: ESB Networks has not published available generation capacity for KELLIS.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedSep 17, 2024
Further information requestedNov 11, 2024
Further information receivedApr 30, 2025
Decision dueAug 3, 2025
Decision madeJul 31, 2025
Appeal submittedAug 26, 2025
Appeal decidedJan 17, 2026
Permission expiresJan 16, 2031
DecisionREFUSED
Appeal reference323496-25
Appeal decisionCONDITIONAL

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Carlow County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.