Wind at Ballyhoura

Castlepook North Carker North Ballyhoura Co.Cork

This application's address does not name a town or townland, so it is listed under Ballyhoura because that is the nearest area we track — 0.0 km away. That is a distance we measured, not a location the planning record states.

No decision recorded
Planning status
Not stated
Capacity
the application states no figure in MW
Not published
Site area (hectares)
Wind
Technology

A wind farm is already operating here

Castlepook (1) — connected to the grid in 2017, 1.6 km from this application's site, with 33.1 MW maximum export capacity, feeding the Charleville node. SEAI records its status as Energised.

This is a record about the location, not about this application. Several applications can sit at one wind farm — extensions, repowers and amendments among them — and this one may be unrelated to it. Matched by name and position from SEAI's Wind Farms in Ireland (June 2022 snapshot, CC-BY 4.0), so it records what had connected by that date rather than what is generating now.

Grid

Nearest substation: STREAMHILL (38 kV), 1.62 km away.
Association: No confident match to a named grid station.
Available capacity: ESB Networks has not published available generation capacity for STREAMHILL.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedOct 22, 2014
Decision dueDec 16, 2014

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Cork County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.