Wind at Ballyhubert

Pollymount Bellanamullia Scramoge , Treanaceeve and Ballyhubert , County Roscommon.

Permission granted
Planning status
Not stated
Capacity
the application states no figure in MW
49.774
Site area (hectares)
Wind
Technology

Grid

Nearest substation: SLIABH BAWN (110 kV), 4.43 km away.
Association: The application names SLIABH BAWN as its connection point.
Available capacity: ESB Networks has not published available generation capacity for SLIABH BAWN.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedSep 15, 2025
Further information requestedDec 23, 2025
Further information receivedJun 5, 2026
Decision dueAug 20, 2026
Decision madeAug 20, 2026
DecisionCONDITIONAL

What we have seen change

Recorded by this tracker each time the register was checked. It begins when we first observed the application, not when the application was made.

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Roscommon County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.