Solar at Barrymore

Ballycurrany East Barrymore Co Cork

This application's address does not name a town or townland, so it is listed under Barrymore because that is the nearest area we track — 0.0 km away. That is a distance we measured, not a location the planning record states.

Application submitted
Planning status
Not stated
Capacity
the application states no figure in MW
Not published
Site area (hectares)
Solar
Technology

Grid

Nearest substation: MIDLETON (110 kV), 3.45 km away.
Association: No confident match to a named grid station.
Available capacity: 20.1 MW of firm generation capacity available at MIDLETON.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedJul 30, 2025
Decision dueSep 22, 2025

What we have seen change

Recorded by this tracker each time the register was checked. It begins when we first observed the application, not when the application was made.

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Cork County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.