Solar at Callan

Ballytobin , Bolton , Callan

Permission granted
Planning status
Not stated
Capacity
the application states no figure in MW
5.4
Site area (hectares)
Solar
Technology

Grid

Nearest substation: CALLAN (38 kV), 2.05 km away.
Association: Matched to CALLAN on place name and proximity (2.05 km).
Available capacity: 1.2 MW of firm generation capacity available at CALLAN.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedDec 21, 2020
Further information requestedFeb 16, 2021
Further information receivedApr 29, 2021
Decision dueMay 26, 2021
Decision madeMay 18, 2021
Permission grantedJun 18, 2021
Permission expiresJun 17, 2031
DecisionCONDITIONAL

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Kilkenny County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.