Solar at Damastown Industrial Park

Astellas Ireland Co Ltd, Damastown Industrial Park, Dublin, D15

Permission granted
Planning status
Not stated
Capacity
the application states no figure in MW
2.58
Site area (hectares)
Solar
Technology

Grid

Nearest substation: MACETOWN (110 kV), 0.39 km away.
Association: Nothing states a connection point and the place name does not match a station, but MACETOWN is only 0.39 km away — close enough that it is usually, though not always, where a project like this connects. Counted separately from the match rate.
Available capacity: 25.4 MW of firm generation capacity available at MACETOWN.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedFeb 10, 2025
Decision dueApr 4, 2025
Decision madeMar 27, 2025
Permission grantedMay 9, 2025
DecisionGRANT PERMISSION

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Fingal County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.