Solar at Dually

Boscabell Garranmore Newark , Fussough and Dually , County Tipperary

Permission granted
Planning status
Not stated
Capacity
the application states no figure in MW
129.0
Site area (hectares)
Solar
Technology

This project holds a grid connection offer

EirGrid's connection batches record an offer for this application with a maximum export capacity of 80.0 MW, connecting at the Kill Hill node. EirGrid lists it as Boscabell Solar Farm, applicant Grouse Solar Limited. The offer quarter is Q2 2026.

Source: ECP-GSS-1 Final Batch, May 2026. Matched to this application by the planning reference EirGrid publishes, confirmed against the county. An offer is a place in the connection process, not a connection: it does not mean the project is built or generating.

Grid

Nearest substation: CASHEL (38 kV), 3.89 km away.
Association: No confident match to a named grid station.
Available capacity: No firm generation capacity currently available at CASHEL.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedMar 4, 2024
Further information requestedApr 26, 2024
Further information receivedJan 24, 2025
Decision dueMar 20, 2025
Decision madeMar 19, 2025
Appeal submittedApr 11, 2025
Appeal decidedSep 5, 2025
Permission expiresSep 4, 2035
DecisionCONDITIONAL
Appeal referenceABP-322270-25
Appeal decisionCONDITIONAL

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Tipperary County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.