Solar at Dublin 1

'Dublin Arch', on a site adjacent to Connolly Station, Sheriff Street Lower, Dublin 1, D01

Permission granted
Planning status
Not stated
Capacity
the application states no figure in MW
2.86
Site area (hectares)
Solar
Technology

Grid

Nearest substation: SHERIFF STREET (38 kV), 0.18 km away.
Association: Matched to SHERIFF STREET on place name and proximity (0.18 km).
Available capacity: 13.3 MW of firm generation capacity available at SHERIFF STREET.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedJan 13, 2022
Further information requestedMar 9, 2022
Further information receivedMay 18, 2022
Decision dueJul 12, 2022
Decision madeJul 12, 2022
Permission grantedAug 23, 2022
DecisionGRANT PERMISSION

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Dublin City Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.