Battery storage at Dublin 8
ESB lands, south of Kylemore Way, and north west of the existing ESB Networks premises, Kylemore Way, Dublin 8
Grid
Association: Nothing states a connection point and the place name does not match a station, but INCHICORE is only 0.15 km away — close enough that it is usually, though not always, where a project like this connects. Counted separately from the match rate.
Available capacity: 315.1 MW of firm generation capacity available at INCHICORE.
A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.
Planning timeline
| Application lodged | Oct 23, 2019 |
|---|---|
| Decision due | Dec 17, 2019 |
| Decision made | Dec 13, 2019 |
| Permission granted | Jan 28, 2020 |
| Decision | GRANT PERMISSION |
Source
Planning data: national planning register (ArcGIS IrishPlanningApplications), Dublin City Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Own land near one of these?
We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.
Email us to be added to the list — we will only use it to send project alerts for the areas you name.
No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.