Solar at Enniscorthy Rural

MONFIN, ENNISCORTHY RURAL

Permission lapsed
Planning status
Not stated
Capacity
the application states no figure in MW
12.7
Site area (hectares)
Solar
Technology

Grid

Nearest substation: MONFIN (38 kV), 0.25 km away.
Association: Matched to MONFIN on place name and proximity (0.25 km).
Available capacity: 2 MW of firm generation capacity available at MONFIN.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedJun 17, 2016
Decision dueAug 11, 2016
Decision madeAug 3, 2016
Permission grantedJan 10, 2017
Appeal submittedAug 31, 2016
Appeal decidedJan 10, 2017
Permission expiresJan 9, 2026
DecisionRefused
Appeal referencePL 26.247176
Appeal decisionGranted (Conditional)

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Wexford County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.