Battery storage at Killala
SSE Thermal Tawnaghmore Generation Station , Tawnaghmore Upper , Kilala Co. Mayo
A wind farm is already operating here
This is a record about the location, not about this application. Several applications can sit at one wind farm — extensions, repowers and amendments among them — and this one may be unrelated to it. Matched by name and position from SEAI's Wind Farms in Ireland (June 2022 snapshot, CC-BY 4.0), so it records what had connected by that date rather than what is generating now.
Grid
Association: The application names TAWNAGHMORE as its connection point.
Available capacity: 0.1 MW of firm generation capacity available at TAWNAGHMORE.
A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.
Planning timeline
| Application lodged | Feb 28, 2025 |
|---|---|
| Decision due | Apr 24, 2025 |
| Decision made | Apr 24, 2025 |
| Permission granted | May 26, 2025 |
| Permission expires | May 25, 2030 |
| Decision | CONDITIONAL |
Source
Planning data: national planning register (ArcGIS IrishPlanningApplications), Mayo County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.
Own land near one of these?
We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.
Email us to be added to the list — we will only use it to send project alerts for the areas you name.
No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.