Solar at Killoran

Cooleeny , Derryfadda and Killoran , Co. Tipperary

Permission granted
Planning status
122.0
Capacity
as stated in the application
77.0
Site area (hectares)
Solar
Technology

Grid

Nearest substation: LISHEEN (110 kV), 0.99 km away.
Association: Nothing states a connection point and the place name does not match a station, but LISHEEN is only 0.99 km away — close enough that it is usually, though not always, where a project like this connects. Counted separately from the match rate.
Available capacity: 20.5 MW of firm generation capacity available at LISHEEN.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedJul 30, 2021
Further information requestedSep 22, 2021
Further information receivedJan 28, 2022
Decision dueFeb 24, 2022
Decision madeFeb 23, 2022
Permission grantedMar 29, 2022
Permission expiresMar 28, 2027
DecisionCONDITIONAL

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Tipperary County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.