Wind at Knock South

Knock South ,

Permission refused
Planning status
4.2
Capacity
as stated in the application
1.93
Site area (hectares)
Wind
Technology

A wind farm is already operating here

Knock South Wind Farm (2) — connected to the grid in 1999, 0.6 km from this application's site, with 0.69 MW maximum export capacity, feeding the Screeb node. SEAI records its status as Connected.

This is a record about the location, not about this application. Several applications can sit at one wind farm — extensions, repowers and amendments among them — and this one may be unrelated to it. Matched by name and position from SEAI's Wind Farms in Ireland (June 2022 snapshot, CC-BY 4.0), so it records what had connected by that date rather than what is generating now.

Grid

Nearest substation: KILROE (38 kV), 1.45 km away.
Association: Nothing states a connection point and the place name does not match a station, but KILROE is only 1.45 km away — close enough that it is usually, though not always, where a project like this connects. Counted separately from the match rate.
Available capacity: ESB Networks has not published available generation capacity for KILROE.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedJun 11, 2021
Further information requestedAug 5, 2021
Further information receivedNov 12, 2021
Decision dueJan 8, 2022
Decision madeJan 7, 2022
Appeal submittedJan 27, 2022
Appeal decidedJun 6, 2023
DecisionREFUSED
Appeal referenceABP-312599-22
Appeal decisionREFUSED

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Galway County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.