Wind at Lumcloon

STONESTOWN CORAKNOCK GLEBE , COOLREAGH OR CLOGHANHILL , CORTULLAGH OR GROVE AND LUMCLOON

Permission lapsed
Planning status
Not stated
Capacity
the application states no figure in MW
11.4
Site area (hectares)
Wind
Technology

Grid

Nearest substation: LUMCLOON (38 kV), 1.92 km away.
Association: Matched to LUMCLOON on place name and proximity (1.92 km).
Available capacity: 4.2 MW of firm generation capacity available at LUMCLOON.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedNov 22, 2019
Decision dueJan 25, 2020
Decision madeJan 24, 2020
Permission grantedMar 11, 2020
Permission expiresMar 10, 2025
DecisionCONDITIONAL

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Offaly County Council. Grid capacity: ESB Networks published capacity data. Retrieved Oct 28, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.