Battery storage + Solar at Monvallet
Toomes and Monvallet , Co Louth
Grid
Association: Nothing states a connection point and the place name does not match a station, but LOUTH is only 0.63 km away — close enough that it is usually, though not always, where a project like this connects. Counted separately from the match rate.
Available capacity: ESB Networks has not published available generation capacity for LOUTH.
A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.
Planning timeline
| Application lodged | May 24, 2021 |
|---|---|
| Further information requested | Jul 9, 2021 |
| Further information received | Aug 4, 2021 |
| Decision due | Aug 31, 2021 |
| Decision made | Aug 26, 2021 |
| Permission granted | Sep 27, 2021 |
| Permission expires | Sep 26, 2026 |
| Decision | CONDITIONAL |
Source
Planning data: national planning register (ArcGIS IrishPlanningApplications), Louth County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.
Own land near one of these?
We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.
Email us to be added to the list — we will only use it to send project alerts for the areas you name.
No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.