Solar at Mullanadarragh

Mullanadarragh , Leitrim , Ireland

Permission granted
Planning status
10.0
Capacity
as stated in the application
11.24
Site area (hectares)
Solar
Technology

Grid

Nearest substation: CARRIGALLEN (38 kV), 0.96 km away.
Association: The application names CARRIGALLEN as its connection point.
Available capacity: 4.5 MW of firm generation capacity available at CARRIGALLEN.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedNov 21, 2025
Decision dueJan 24, 2026
Decision madeJan 20, 2026
Permission grantedFeb 20, 2026
Permission expiresFeb 19, 2031
DecisionCONDITIONAL

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Leitrim County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.