Battery storage at Mullingar

Irishtown , Mullingar , Co.Westmeath

Permission lapsed
Planning status
Not stated
Capacity
the application states no figure in MW
0.63
Site area (hectares)
Battery storage
Technology

Grid

Nearest substation: MULLINGAR (110 kV), 0.28 km away.
Association: Matched to MULLINGAR on place name and proximity (0.28 km).
Available capacity: 24.8 MW of firm generation capacity available at MULLINGAR.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedFeb 19, 2018
Further information requestedApr 13, 2018
Further information receivedJan 9, 2019
Decision dueFeb 5, 2019
Decision madeFeb 5, 2019
Appeal submittedFeb 27, 2019
Appeal decidedJul 1, 2019
Permission expiresJun 30, 2024
DecisionCONDITIONAL
Appeal referenceABP 303812-19
Appeal decisionMODIFIED

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Westmeath County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.