Battery storage at Navan

Causetown , Stackallen , Navan Co Meath

Permission granted
Planning status
100.0
Capacity
as stated in the application
2.82
Site area (hectares)
Battery storage
Technology

Grid

Nearest substation: GORMAN (220 kV), 0.65 km away.
Association: Matched to NAVAN on place name and proximity (4.59 km).
Available capacity: 30.7 MW of firm generation capacity available at NAVAN.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedSep 15, 2020
Further information receivedDec 7, 2020
Decision dueJan 12, 2021
Decision madeJan 11, 2021
Permission grantedFeb 23, 2021
Permission expiresDec 5, 2028
DecisionCONDITIONAL

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Meath County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.