Solar at Nth

Cloghboley - Carrowgarriff Nth , Co. Galway

Permission granted
Planning status
Not stated
Capacity
the application states no figure in MW
125.0
Site area (hectares)
Solar
Technology

This project holds a grid connection offer

EirGrid's connection batches record an offer for this application with a maximum export capacity of 101.0 MW, connecting at the Cashla node. EirGrid lists it as South Galway Solar, applicant Harmony Solar Galway Limited. The offer quarter is Q3 2026.

Source: ECP-GSS-1 Final Batch, May 2026. Matched to this application by the planning reference EirGrid publishes, confirmed against the county. An offer is a place in the connection process, not a connection: it does not mean the project is built or generating.

Grid

Nearest substation: KILCOLGAN (38 kV), 6.14 km away.
Association: No confident match to a named grid station.
Available capacity: 2.7 MW of firm generation capacity available at KILCOLGAN.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedSep 24, 2023
Further information requestedNov 17, 2023
Further information receivedMay 31, 2024
Decision dueJul 25, 2024
Decision madeJul 25, 2024
Appeal submittedAug 21, 2024
Appeal decidedOct 21, 2025
Permission expiresOct 20, 2030
DecisionREFUSED
Appeal referenceABP-320662-24
Appeal decisionCONDITIONAL

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Galway County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.