Battery storage at Portarlington

Bracklone , Portarlington , Co. Laois

Permission granted
Planning status
Not stated
Capacity
the application states no figure in MW
3.4
Site area (hectares)
Battery storage
Technology

This project holds a grid connection offer

EirGrid's connection batches record an offer for this application with a maximum export capacity of 115.0 MW, connecting at the Bracklone node. EirGrid lists it as Lea (Bracklone) BESS, applicant Neoen Renewables Ireland Limited. The offer quarter is Q4 2026. This site's own grid match for this application is PORTARLINGTON, which does not agree. EirGrid assigns the connection point, so its node is the one to trust.

Source: ECP-GSS-1 Final Batch, May 2026. Matched to this application by the planning reference EirGrid publishes, confirmed against the county. An offer is a place in the connection process, not a connection: it does not mean the project is built or generating.

Grid

Nearest substation: PORTARLINGTON (38 kV), 3.14 km away.
Association: Matched to PORTARLINGTON on place name and proximity (3.14 km).
Available capacity: 4.1 MW of firm generation capacity available at PORTARLINGTON.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedJul 10, 2023
Further information requestedSep 1, 2023
Further information receivedDec 15, 2023
Decision dueFeb 17, 2024
Decision madeFeb 14, 2024
Permission grantedMar 21, 2024
Permission expiresMar 20, 2034
DecisionCONDITIONAL

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Laois County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.