Wind at Rathbaun

Templehouse , Rathbaun , Co. Sligo

Permission granted
Planning status
5.0
Capacity
as stated in the application
9.53
Site area (hectares)
Wind
Technology

Grid

Nearest substation: BALLYMOTE (38 kV), 2.56 km away.
Association: No confident match to a named grid station.
Available capacity: 0.5 MW of firm generation capacity available at BALLYMOTE.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedApr 1, 2021
Decision dueMay 26, 2021
Decision madeMay 26, 2021
Appeal submittedJun 28, 2021
Appeal decidedJul 11, 2023
Permission expiresJul 10, 2028
DecisionREFUSED
Appeal referenceABP-310612-21
Appeal decisionCONDITIONAL

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Sligo County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.