Solar at Rathkeale

Townland of Ardgoulbeg , near Rathkeale , Co. Limerick

Permission granted
Planning status
Not stated
Capacity
the application states no figure in MW
63.4
Site area (hectares)
Solar
Technology

This project holds a grid connection offer

EirGrid's connection batches record an offer for this application with a maximum export capacity of 54.0 MW, connecting at the Rathkeale node. EirGrid lists it as Ardgoulbeg Solar, applicant Harmony Solar Rathkeale Limited. The offer quarter is Q3 2026.

Source: ECP-GSS-1 Final Batch, May 2026. Matched to this application by the planning reference EirGrid publishes, confirmed against the county. An offer is a place in the connection process, not a connection: it does not mean the project is built or generating.

Grid

Nearest substation: RATHKEALE (110 kV), 0.55 km away.
Association: The application names RATHKEALE as its connection point.
Available capacity: No firm generation capacity currently available at RATHKEALE.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedApr 11, 2024
Further information requestedJun 4, 2024
Further information receivedAug 9, 2024
Decision dueOct 22, 2024
Decision madeOct 22, 2024
Appeal submittedNov 14, 2024
Appeal decidedMar 27, 2025
Permission expiresMar 26, 2030
DecisionREFUSED
Appeal reference321242-24
Appeal decisionCONDITIONAL

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Limerick County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.