Renewable energy projects in County Limerick

Every solar, wind and battery application in the county's planning register, joined to the ESB Networks substation nearest it and the generation capacity that substation has available. Updated from public records; last checked Sep 1, 2026.

Enter an Eircode, or a town, village or townland name. Only the routing key — the first three characters — is used and it is never stored: that places you within a few kilometres of your town, which is all this needs, and Eircode's full address database is licensed and not public anyway. All 139 routing keys in the country are covered.

59
Utility-scale projects
solar, wind and battery
42
Still live in the system
not refused, withdrawn or lapsed
6.3
MW stated
from 3 of 59 applications that state one
2000.9
Hectares of site area
across 38 applications
25
Substations with no capacity
of 147 near these projects
3
Under appeal now
9 have been appealed at some point

Where they are

The map plots 59 projects on a background supplied by OpenStreetMap, which receives your IP address when it loads.

Positions are as published in the national planning register, or — for applications made directly to An Coimisiun Pleanala — at the centre of the site boundary that case publishes. Colour shows planning status.

Planning status

Planning status of renewable projects in County Limerick Application submitted 5 Further information reque… 2 Under appeal 3 Permission granted 32 Permission refused 2 Withdrawn 6 Permission lapsed 2 No decision recorded 7

Technologies

Technologies in the County Limerick pipeline Solar 47 Wind 12 Battery storage 5

A project appears under each technology it includes, so co-located solar-and-battery schemes are counted in both.

Grid capacity

33 of 59 projects are matched to a named substation with enough confidence to publish the link (55.9%). The remaining 26 are listed as unmatched rather than guessed — matching a project to the wrong substation is worse than leaving it unmatched, so a name match must also be corroborated by distance before it counts.

17 projects sit at a substation ESB Networks currently publishes as having no firm generation capacity available.

Areas

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.

Live applications

Wind — Killonan

Application submitted KillonanCapacity not stated788.98 ha siteLodged Mar 27, 2026 Ref ABP-324164
Grid: PIPERHILL (38 kV), 1.93 km away. ESB Networks has not published available generation capacity for PIPERHILL.

Wind — Knockuregare

Application submitted KnockuregareCapacity not stated252.91 ha siteLodged Sep 29, 2025 Ref ABP-323780
Grid: BRUFF (38 kV), 6.53 km away. 4.1 MW of firm generation capacity available at BRUFF.

Solar — Knocklong

Application submitted KnocklongCapacity not stated210.0 ha siteLodged Aug 10, 2026 Ref 2660918
Grid: GARRYSPILLANE (38 kV), 7.28 km away. No firm generation capacity currently available at GARRYSPILLANE.

Wind — Charleville

Application submitted CharlevilleCapacity not stated158.18 ha siteLodged Sep 10, 2025 Ref ABP-323635
Grid: RATHGOGGIN (38 kV), 4.83 km away. 8.8 MW of firm generation capacity available at CHARLEVILLE.

Solar — Glin

Application submitted GlinCapacity not stated70.01 ha siteLodged Aug 14, 2026 Ref 2660943
Grid: KILPADDOGE (220 kV), 4.19 km away. 1.3 MW of firm generation capacity available at KILPADDOGE.

Solar — Rathkeale

Permission granted RathkealeCapacity not stated63.4 ha siteLodged Apr 11, 2024 Ref 2460320
Grid: RATHKEALE (110 kV), 0.55 km away. No firm generation capacity currently available at RATHKEALE.

Wind — Lisbane

Under appeal LisbaneCapacity not stated43.04 ha siteLodged Dec 19, 2025 Ref 2561367
Grid: DUNMOYLAN (38 kV), 2.67 km away. ESB Networks has not published available generation capacity for DUNMOYLAN.

Solar — Crecora

Permission granted CrecoraCapacity not stated39.54 ha siteLodged Dec 17, 2025 Ref 2561346
Grid: PATRICKSWELL (38 kV), 3.78 km away. 3.4 MW of firm generation capacity available at PATRICKSWELL.

Solar — Raheen

Permission granted RaheenCapacity not stated33.3 ha siteLodged Nov 25, 2024 Ref 2461160
Grid: BALLYCUMMIN (110 kV), 0.42 km away. 12.1 MW of firm generation capacity available at RAHEEN.

Solar — Foynes

Permission granted FoynesCapacity not stated18.0 ha siteLodged Dec 14, 2017 Ref 171174
Grid: FOYNES (38 kV), 2.36 km away. No firm generation capacity currently available at FOYNES.

Solar — Mungret

Permission granted MungretCapacity not stated12.1 ha siteLodged Mar 8, 2018 Ref 18215
Grid: MONETEEN (110 kV), 2.23 km away. ESB Networks has not published available generation capacity for MUNGRET.

Solar — Lisnagry

Permission granted LisnagryCapacity not stated11.4 ha siteLodged Sep 18, 2020 Ref 20940
Grid: AHANE (110 kV), 2.54 km away. 9.7 MW of firm generation capacity available at AHANE.

Solar — Cloonpasteen

Permission granted CloonpasteenCapacity not stated8.54 ha siteLodged Jul 17, 2025 Ref 2560698
Grid: MILFORD (MWR) (38 kV), 3.43 km away. No firm generation capacity currently available at MILFORD (MWR).

Solar — Cappamore

Permission granted CappamoreCapacity not stated7.9 ha siteLodged May 4, 2017 Ref 17396
Grid: CAPPAMORE (38 kV), 1.5 km away. 2.3 MW of firm generation capacity available at CAPPAMORE.

Solar — Mulgrave Street

Permission granted Mulgrave StreetCapacity not stated7.435 ha siteLodged Mar 13, 2025 Ref 2560205
Grid: GARRYOWEN (38 kV), 0.5 km away. 18.6 MW of firm generation capacity available at GARRYOWEN.

Solar — Askeaton

Permission granted AskeatonCapacity not stated7.22 ha siteLodged Jul 1, 2026 Ref 2660751
Grid: ASKEATON (38 kV), 0.55 km away. ESB Networks has not published available generation capacity for ASKEATON.

Solar — Singland Limerick

Under appeal Singland LimerickCapacity not stated6.18 ha siteLodged May 28, 2026 Ref 2660603
Grid: SINGLAND (110 kV), 0.38 km away. 24.2 MW of firm generation capacity available at SINGLAND.

Solar — Glin

Permission granted GlinCapacity not stated4.17 ha siteLodged Aug 21, 2025 Ref 2560828
Grid: TARBERT (220 kV), 6.11 km away. ESB Networks has not published available generation capacity for TARBERT.

Solar — Adare Manor Adare

Permission granted Adare Manor AdareCapacity not stated3.76 ha siteLodged Mar 5, 2024 Ref 2460189
Grid: PATRICKSWELL (38 kV), 5.28 km away. 3.4 MW of firm generation capacity available at PATRICKSWELL.

Solar — Moyross Limerick

Permission granted Moyross LimerickCapacity not stated3.64 ha siteLodged Nov 16, 2023 Ref 2360837
Grid: MOYLISH (38 kV), 0.82 km away. 6.3 MW of firm generation capacity available at MOYLISH.

Solar — Lisbane

Permission granted LisbaneCapacity not stated3.59 ha siteLodged Jan 9, 2024 Ref 2460013
Grid: NEWCASTLEWEST (38 kV), 1.48 km away. No firm generation capacity currently available at NEWCASTLEWEST.

Solar — Raheen

Under appeal Raheen2.33 MW stated3.48 ha siteLodged Apr 30, 2026 Ref 2660490
Grid: BALLYCUMMIN (110 kV), 1.1 km away. 12.1 MW of firm generation capacity available at RAHEEN.

Solar — Foynes

Further information requested FoynesCapacity not stated3.325 ha siteLodged May 19, 2026 Ref 2660559
Grid: FOYNES (38 kV), 0.25 km away. No firm generation capacity currently available at FOYNES.

Solar — Oola

Permission granted OolaCapacity not stated3.24 ha siteLodged May 27, 2022 Ref 22313667
Grid: CAUTEEN (110 kV), 4.82 km away. 8.1 MW of firm generation capacity available at CAUTEEN.

Solar — Croom

Permission granted CroomCapacity not stated2.587 ha siteLodged Feb 26, 2024 Ref 2460159
Grid: PATRICKSWELL (38 kV), 9.11 km away. 3.4 MW of firm generation capacity available at PATRICKSWELL.

Solar — Ballycummin

Permission granted BallycumminCapacity not stated2.387 ha siteLodged Sep 17, 2024 Ref 2460921
Grid: BALLYCUMMIN (110 kV), 0.87 km away. ESB Networks has not published available generation capacity for BALLYCUMMIN.

Solar — Caheranardrish Mungret

Further information requested Caheranardrish MungretCapacity not stated2.2 ha siteLodged Feb 19, 2026 Ref 2660173
Grid: MONETEEN (110 kV), 0.7 km away. ESB Networks has not published available generation capacity for MUNGRET.

Solar — Castletroy Limerick

Permission granted Castletroy Limerick1.0 MW stated1.829 ha siteLodged Apr 16, 2025 Ref 2560332
Grid: CASTLETROY (38 kV), 0.1 km away. 5.8 MW of firm generation capacity available at CASTLETROY.

Battery storage + Wind — Athea

Permission granted AtheaCapacity not stated1.0 ha siteLodged Feb 27, 2026 Ref 2660215
Grid: ATHEA (110 kV), 0.1 km away. ESB Networks has not published available generation capacity for ATHEA.

Solar — Ballinknockane

Permission granted BallinknockaneCapacity not statedLodged Dec 21, 2017 Ref 171220
Grid: FOYNES (38 kV), 3.6 km away. No firm generation capacity currently available at FOYNES.

Wind — Athea

Permission granted AtheaCapacity not statedLodged Dec 21, 2017 Ref 171228
Grid: ATHEA (110 kV), 0.05 km away. ESB Networks has not published available generation capacity for ATHEA.

Solar — Kilmallock

Permission granted KilmallockCapacity not statedLodged Apr 13, 2017 Ref 17326
Grid: KILMALLOCK (38 kV), 0.91 km away. No firm generation capacity currently available at KILMALLOCK.

Battery storage + Solar — Cappamore

Permission granted CappamoreCapacity not statedLodged Aug 9, 2017 Ref 17750
Grid: CAPPAMORE (38 kV), 0.66 km away. 2.3 MW of firm generation capacity available at CAPPAMORE.

Wind — Glengort South

Permission granted Glengort SouthCapacity not statedLodged Nov 8, 2018 Ref 181085
Grid: KNOCKAWARRIGA (38 kV), 0.16 km away. ESB Networks has not published available generation capacity for KNOCKAWARRIGA.

Wind — Athea

Permission granted AtheaCapacity not statedLodged Sep 25, 2018 Ref 18934
Grid: ATHEA (110 kV), 0.04 km away. ESB Networks has not published available generation capacity for ATHEA.

Solar — Shanagolden

Permission granted ShanagoldenCapacity not statedLodged Jan 14, 2019 Ref 1918
Grid: DUNMOYLAN (38 kV), 3.36 km away. ESB Networks has not published available generation capacity for DUNMOYLAN.

Solar — Abbeyfeale

Permission granted AbbeyfealeCapacity not statedLodged Aug 8, 2019 Ref 19782
Grid: ABBEYFEALE (38 kV), 1.65 km away. No firm generation capacity currently available at ABBEYFEALE.

Solar — Moanroe

Permission granted MoanroeCapacity not statedLodged Nov 12, 2021 Ref 211565
Grid: CAUTEEN (110 kV), 5.07 km away. 8.1 MW of firm generation capacity available at CAUTEEN.

Battery storage + Wind — Athea

Permission granted AtheaCapacity not statedLodged Dec 8, 2021 Ref 211702
Grid: ATHEA (110 kV), 0.09 km away. ESB Networks has not published available generation capacity for ATHEA.

Solar — Mullagh

Permission granted MullaghCapacity not statedLodged Nov 29, 2022 Ref 221258
Grid: DUNMOYLAN (38 kV), 2.94 km away. ESB Networks has not published available generation capacity for DUNMOYLAN.