Battery storage + Solar at Saggart

Citywest Hotel & Convention Centre, Saggart, Co. Dublin

Permission lapsed
Planning status
Not stated
Capacity
the application states no figure in MW
13.45
Site area (hectares)
Battery storage + Solar
Technology

Grid

Nearest substation: SAGGART (38 kV), 1.63 km away.
Association: Matched to SAGGART on place name and proximity (1.63 km).
Available capacity: 5.5 MW of firm generation capacity available at SAGGART.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedJul 19, 2023
Further information requestedFeb 13, 2023
Further information receivedJul 19, 2023
Decision dueAug 15, 2023
Decision madeAug 15, 2023
Appeal submittedSep 11, 2023
Appeal decidedSep 3, 2024
Permission expiresMar 11, 2024
DecisionGrant Permission
Appeal referenceABP-317989-23
Appeal decisionGrant Permission

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), South Dublin County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.