Wind at Tullynamoyle

Tullinloughan LackaghTullynamoyle and Gowlaun , Tullynamoyle , Co. Leitrim

Permission granted
Planning status
Not stated
Capacity
the application states no figure in MW
25.0
Site area (hectares)
Wind
Technology

A wind farm is already operating here

Tullynamoyle — connected to the grid in 2011, 0.7 km from this application's site, with 9.0 MW maximum export capacity, feeding the Corderry node. SEAI records its status as Connected.

This is a record about the location, not about this application. Several applications can sit at one wind farm — extensions, repowers and amendments among them — and this one may be unrelated to it. Matched by name and position from SEAI's Wind Farms in Ireland (June 2022 snapshot, CC-BY 4.0), so it records what had connected by that date rather than what is generating now.

Grid

Nearest substation: CORDERRY (110 kV), 5.12 km away.
Association: No confident match to a named grid station.
Available capacity: No firm generation capacity currently available at CORDERRY.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedOct 31, 2024
Further information requestedDec 17, 2024
Further information receivedJan 17, 2025
Decision dueMar 13, 2025
Decision madeMar 3, 2025
Permission grantedApr 4, 2025
Permission expiresApr 3, 2030
DecisionCONDITIONAL

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Leitrim County Council. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.