Wind at Upperchurch

Townland of Mountphilips, near Newport, and townland of Knockcurraghbola, near Upperchurch, Co. Tipperary

Permission refused
Planning status
Not stated
Capacity
the application states no figure in MW
100.22
Site area (hectares)
measured from the published site boundary
Wind
Technology

Grid

Nearest substation: KNOCKANE (110 kV), 3.85 km away.
Association: No confident match to a named grid station.
Available capacity: ESB Networks has not published available generation capacity for KNOCKANE.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedJun 28, 2018
Decision madeDec 17, 2018
DecisionRefuse to Approve

Source

Planning data: An Coimisiún Pleanála case register (ArcGIS Cases_2016_Onwards). This application was made directly to the Commission and is not on Tipperary County Council's planning register. Grid capacity: ESB Networks published capacity data. Retrieved Sep 1, 2026.
Case file: An Coimisiún Pleanála case record.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.