Battery storage at Wider Esb Landholding

The townland of Ballincarroonig, Aghada, Co. Cork, within the wider ESB landholding

Application submitted
Planning status
300.0
Capacity
as stated in the application
Not published
Site area (hectares)
Battery storage
Technology

Grid

Nearest substation: AGHADA 110KV (110 kV), 0.19 km away.
Association: The application names AGHADA as its connection point.
Available capacity: 4.3 MW of firm generation capacity available at AGHADA.

A nearest substation is a measurement of distance, not a statement of where this project will connect. Where a link is published it is because the application names the station, or because the project's own place name matches it and the two are close enough for that to mean something.

Planning timeline

Application lodgedAug 21, 2026

Source

Planning data: national planning register (ArcGIS IrishPlanningApplications), Cork County Council. Grid capacity: ESB Networks published capacity data. Retrieved Oct 28, 2026.
Register entry: council planning file.

Own land near one of these?

We track every solar, wind and battery application in the national planning register — and the large ones made directly to An Coimisiun Pleanala, which never reach a council register at all — as they move through planning, and which substations still have capacity to take a connection. If you want to be told when something is lodged near your land, leave an email address.

Email us to be added to the list — we will only use it to send project alerts for the areas you name.

No lease rates or valuations are published here, and nothing on this site is an offer or a recommendation.